Introduction of Project
User introduction:
SAIHAM TOWER is a new office building in the middle of Dhaka city, To consider the environmental protection and saving the water sources, The clients asked us to design one system to treat the domestic sewage including waste water from toilets and pantries of the office building, and reused it for WC Flushing,Landscape Irrigation and Cooling Tower make up
| Feed water quality | The domestic sewage including waste water from toilets and pantries of the office building BOD:300mg/L, SS:400mg/L, COD:800mg/L,Hardness:100mg/L |
| Capacity: | 50m³/D |
| Output water quality: | WC Flushing, Landscape Irrigation and Cooling Tower make up BOD: 5 mg/litre, SS:1mg/L, COD:20mg/L,Hardness:5mg/L |
| Technical process: | Containerized Sewage water treatment plant, UF system, Disk filter, Softening system, Ro system |
Project Details
DATE:
August, 2017
CLIENT
SAIHAM TOWER AT DHAKA, BANGLADESH
CONTRACTOR
Xi’an Haohaijia (CHIWATEC) Water Treatment Technology Co.,Ltd.
Project Gallery

















