Introduction of Project
User introduction:
This system is designed to treat bore well water based on the water analysis report supplied below,and the capacity is DM plant 10.0m3/hr The output water meet the requirement of output water quality. The product water is used for the electrical power plant. All the electrical element in the control system are ABB brand and with Siemenz PLC and HMI. The product water hardness is less than 5ppm, iron content less than 0.3ppm.
| Feed water conductivity: | 900.00mg/L |
| Temprature: | 25℃ |
| Production: | 1 x 10.0 m3/hr DM plant. |
| Recovery rater: | 60% for 1st pass, 80% for 2nd pass |
| Conductivity for the permeated water: | less than 3 mg/L |
Project Details
DATE
Jan. 2025
CONTRACTOR
Xi’an CHIWATEC Water Treatment Technology Co.,Ltd.