Introduction of project
User introduction:
Atse Yohaness Hotel is the four star hotel in Mekella, Ethiopia, supply the comfortable lodging for the guest from oversea during their trip. They faced serious problems for room all the articles, that are very easy to rust, corrode, and blocking as the water they used have high content of Chlorine, and salt. And they also need big water tank to storage the water it is shutoff of power frequently in their city. We make one stainless steel tank 56TPH and one stainless steel tank 72TPH in their water treatment workshop, and install one water treatment plant 72m3/day,
| Feed water quality | The feed water from deep well water , TDS :1320 ppm |
| Capacity: | 72TPD |
| Output water quality: | 13 ppm |
| Technical process: | Raw water tank+MMF+ ACF + reverse osmosis (RO) +delivery pump +pure water tank |
| Work scope: | Equipment supply, installation, commission, training |
Project Details
DATE
July. 2013
CLIENT
Atse Yohaness Hotel in Mekella, Ethiopia
CONTRACTOR
Xi’an Haohaijia (CHIWATEC) Water Treatment Technology Co.,Ltd.
Project Gallery








FOLLOW US
Do you have a water treatment project we can help with
* Designing,machining,installing,commissioning, customize and one-stop service