yontroducción de Proyecto
Introducción del usuario:
This is a sewage water treatment plant for oil field. Raw water COD is 400ppm, BOD is 200ppm. The outlet water quality is BOD 50ppm, COD is 6ppm. The capacity is 50m3/day.
The complete set of the machine is combined two containers. The black one is underground with adjust tank, grid and oil separator, septic tank and adjust tank. The blue one is on the ground with Anaerobic tank, Aerobic tank, MBR tank and cleaning water tank as well as the control room. All the pipelines are connected well inside the container. When the machine is arrived at site, the client only need to connect the inlet water, outlet water and electrical power supply.
detalles del proyecto
FECHA
Dec. 2023
CONTRATISTA
Xi'an CHIWATEC Tecnología de Tratamiento de Agua Co.,Ltd.
Galería de proyectos



SÍGANOS
¿Tiene un proyecto de tratamiento de agua con el que podamos ayudar?
* Diseño, mecanizado, instalación, puesta en marcha, personalización y servicio integral